// INDUSTRIAL ADAPTER · Q3 2026 PREVIEWCOMING SOON

Plug DARA into your
factory floor.

Read OPC UA, MODBUS and SCADA historians directly. DARA's Edge Gateway streams your shipped tonnes, plant power, vibration RMS and stockpile balances into the same intelligence layer that drives your Hedge Ledger and cash-flow forecasts — live, every shift, without buying a single new sensor.

12 mining & shipping operators on the waitlist
// FLOW · SITE → DARA
[Pilbara mine site]                        [DARA cloud]

  PLCs / sensors                            
       ↓                                    
  SCADA historian ─┐                        
                   │                        
  OPC UA server ───┤                        
                   │                        
  MODBUS RTU ──────┴─▶ DARA Edge ─▶ TLS ─▶ /api/iot/ingest
                       Gateway              ↓
                       (Python)             ↓
                                           Hedge Co-Pilot
                                           Forecasts
                                           Slack alerts
LIVE INGEST DEMO

Try the production endpoint — DARA accepts a sample payload and echoes back the receipt.

// PROTOCOLS WE READ

Three industrial languages. One unified data layer.

Your plant already speaks at least one of these. Our gateway translates them all into clean JSON DARA can analyse alongside your CSVs, Xero books, and commodity indices — no new hardware, no rip-and-replace.

OPC UA

Modern industrial standard. Secure, typed, subscribe-to-changes.

FOUND ON
Siemens · Rockwell · GE · ABB control PCs
EXAMPLE TAGS
Mine_Stockpile.Tonnes · Crusher_2.Output_TPH
MODBUS

Battle-tested 1979 protocol. Still runs ~70% of factory floors.

FOUND ON
Pumps · flow meters · PLCs · serial-over-RS485 / TCP
EXAMPLE TAGS
Register 40010 → 412.7 (tonnes / hour)
SCADA Historian

The plant's existing time-series database. We tap straight in.

FOUND ON
Wonderware · Ignition · Honeywell PHD · OSIsoft PI
EXAMPLE TAGS
Plant_Power.kWh · Vessel_AIS.ETA
// PIPELINE

Site → DARA in 6 steps.

01
PLC / Sensor
Existing kit
02
SCADA / OPC UA
On-site
03
DARA Edge Gateway
Linux/Windows · Python
04
TLS push
Buffered, auto-resume
05
/api/iot/ingest
DARA cloud
06
Hedge Co-Pilot · Forecasts · Alerts
Live decisions
ZERO NEW HARDWARE

Runs on the Windows PC or Linux box you already have in the control room. Or a Raspberry Pi if you prefer.

BUFFERED + RESUMABLE

Edge gateway buffers locally so a 30-min internet outage doesn't lose data. Auto-resumes on reconnect.

READ-ONLY BY DESIGN

DARA never writes back to your PLCs. We only listen — your operations team stays in full control.

// WHAT IT UNLOCKS

Real telemetry. Real decisions.

Live cash-flow forecasts

Stockpile tonnes × today's iron-ore index = your real revenue band, refreshed every shift instead of every month-end.

Predictive maintenance alerts

Conveyor vibration up 8% over 24h? DARA pings your Slack with a 7-day inspection window before the bearing seizes.

ESG disclosure pre-fill

Plant kWh + Scope-2 emissions factors auto-feed your sustainability report. JORC, IFRS S2, AASB compliance baked in.

Hedge-Ledger drives off real volume

Your accepted hedges mark-to-market against actual shipped tonnes — not last month's CSV. Treasury close in minutes.

// ROI CALCULATOR · LIVE

What's DARA worth to your operation?

Plug in your production assumptions. Numbers are conservative — we'd rather under-promise. Real pilot results often exceed these.

INDUSTRY
ANNUAL VOLUME (tonnes / yr)
1,600,00032,000,000
AVG PRICE ($ / tonne)
32263
PLANT / SITE COUNT
150
UNPLANNED DOWNTIME (HRS / YR)
02,000
DOWNTIME COST ($ / HR)
500150,000
HEDGE RATIO (% currently hedged)
0%100%
// PROJECTED ANNUAL IMPACT
for Mining (iron ore / coal / gold)
● LIVE
Annual revenue baseline
$840.00M
Forecast accuracy lift
Closes ~45% of your forecast-error gap
$45.36M
Downtime reduction
~20% fewer unplanned hours
$1.73M
Hedge effectiveness uplift
On the unhedged tail of revenue
$4.91M
Total annual $ impact
$52.00M
ROI multiple
866.7×
Payback
0.0 mo
Submit the form below and we'll send you a tailored ROI breakdown for mining (iron ore / coal / gold) within 24 hours.
Methodology: Annual revenue = volume × price. DARA forecast lift = baseline forecast error band × 45% closure. Downtime lift = hours × cost/hr × 20%. Hedge lift = unhedged revenue × 6% volatility band × 15% effectiveness gain. Pricing assumes DARA at $60K/yr per workspace; multi-site discounts available.
// PRIVATE BETA · Q3 2026

Join the waitlist.

Limited to 25 mining, shipping, and energy operators for the first cohort. We'll help you install the gateway, map your tags, and prove out the business case against your existing data within two weeks.

PROTOCOLS YOU USE
NOTES (OPTIONAL)
DARA OS — Enterprise data-to-revenue terminal · daraos.ai